Smyrna, Georgia is seeking bids for a unit-price contract to construct the WINDY HILL BOULEVARD project. The scope of work includes, but is not limited to, widening and reconstructing the existing 5-lane roadway between South Cobb Drive and Atlanta Road. The proposed roadway will include four express lanes to facilitate east/west through traffic; 1-lane frontage roads in each direction to accommodate local traffic; bicycle lanes; and pedestrian trails. The project will also include two bridges strategically placed to provide local vehicular and pedestrian traffic the ability to traverse the express lanes.
UPDATED: Sealed Bids are due before 10:00 AM on Tuesday, February 18, 2020.
Bid packages and flash drives can be purchased for $200 with a company check or money order made payable to CROY ENGINEERING, located at 200 North Cobb Parkway, Building 400, Suite 413, Marietta, GA 30062.
There will be a Mandatory pre-bid conference held at 2:00 p.m., Wednesday, January 08, 2020, in the Human Resources Conference Room on the First Floor of City Hall at 2800 King Street.
Please view complete advertisement:
Advertisement - RFP 20-016 Windy Hill Boulevard
Addendum 1 - RFP 20-016 Windy Hill Blvd
Addendum 1 - Incremental Stationing Report - RFP 20-016 Windy Hill Blvd
Sign In Sheet_RFP 20-016 Mandatory Pre-bid Conference Windy Hill Blvd
Addendum 2 - RFP 20-016 Windy Hill Blvd
Please use link below to access revised plans for Windy Hill Boulevard project (Addendum 2):
https://croyengineering.sharefile.com/d-s5eda2c10a8845cc8
Addendum 3 - RFP 20-016 Windy Hill Blvd
BID TAB - RFP 20-016 Windy Hill Blvd (Unofficial Results - Bids are currently being reviewed by Croy Engineering and Smyrna Public Works)
Bid Recommendation - RFP 20-016 Windy Hill Boulevard